Analyzing the Financial Performance of Discom Sector: (Special Reference to Uttarakhand Power Corporation Limited, Uttarakhand)

Authors

  • Dr Varsha Gupta Quantum  School of Graduate Studies, Quantum University, Roorkee
  • Dr. Sanjeev Chaddha Mahatma Gandhi State Institute of Public Administration, Chandigarh, Punjab

Keywords:

AT&C, ATC ARR Gap, collection effeciency, DISCOMS, outstanding arrears receivable, State elecrticity board, UPCL

Abstract

After India attained independence, the power sector, being one of the vital cogs in the wheel of infrastructure development, was paid adequate attention to setting up State Electricity Boards (SEBs) to provide easy electricity access to all its citizens. Due to limited operational improvements, these companies suffered huge losses, and even today, their financial position is quite frail. The Power distribution companies, one of the parts of SEBs, also continued to suffer losses, which prevented further expansion and strengthening of the distribution system (Verma, Mukherjee, Yadav, & Ghosh, 2020).

The current study, focusing on understanding the robustness of the power sector in general and Uttarakhand Power Corporation Limited (UPCL) in particular, observed that UPCL shouldering the responsibility of providing easy access to power at a subsidised rate, has accumulated huge arrears both from the government as well as non-government sectors, which has adversely affected the financial health of the company. In addition to these outstanding liabilities, various other factors have also contributed to the deteriorating economic position of UPCL. Although the government has been taking several measures to improve the situation. still, Govt. sector itself is accountable for around one-third of the pending dues of UPCL.

Author Biographies

Dr Varsha Gupta, Quantum  School of Graduate Studies, Quantum University, Roorkee

Dr Varsha Gupta  Associate Professor, Quantum     School of Graduate Studies, Quantum University, Roorkee

 Email: varshagarg2083@gmail.com 

Dr. Sanjeev Chaddha, Mahatma Gandhi State Institute of Public Administration, Chandigarh, Punjab

Dr Sanjeev Chaddha  Professor and Head, MDC,  MGSIPA, Govt. of Punjab,  Chandigarh  Email: drsanjeevchaddha007@gmail.com

References

(2024). 12th Annual Intergrated Rating and Ranking: Power distribution utilities. Ministry of Power. Retrieved from https://pfcindia.com/DocumentRepository/ckfinder/files/GOI_INITIATIVE/Annual_Integrated_Ratings_of_State_DISCOMs/12%%20Integrated%20Report_Print%20versionRajbhasha.pdf

Josey, A., Dixit, S., Jog, M., & Nhalur, S. (2024). Electricity distribution companies: Understanding present challanges and shaping future opportunities. Issues before the sixteenth Finance Commission. New Delhi: National Institute of Public Finance and Policy.

Komal Chawla. (2019). Prepaid electricity meters: Desired results are yet to come. Retrieved from ClearTax Chronicles: https://news.cleartax.in/prepaid-electricity-meters-desired-results-are-yet-to-come/3627/

National Smart Grid Mission. (2024). Retrieved from https://www.nsgm.gov.in/: https://www.nsgm.gov.in/en/sm-stats-all

Parashar, B. K. (2023). Two UP government departments owe arrears worth ?21,699 crore to power corporation. Retrieved from https://www.hindustantimes.com/: https://www.hindustantimes.com/cities/lucknow-news/government-departments-in-u-p-remain-biggest-defaulters-owing-over-rs-50-000-crore-in-electricity-dues-101691341771300.html

PFC. (2025). Report on Performance of Power Utility 2023-24. New Delhi: Power Finance Corporation Ltd.

Raizada, A. (2024). India’s Broken Power Economics Addressing DISCOM Challenges. Center for Energy and Climate. Retrieved from https://www.ifri.org/sites/default/files/2024-10/ifri_raizada_india_broken_power_economy_2024_1.pdf

Soumya Deep Das, R. S. (2020). Viability of power distribution in India – Challenges and Way Forward. Energy Policy, 147. doi:https://doi.org/10.1016/j.enpol.2020.111882

TOI. (2020). Pending electric bills stalling power projects, says UPCL. Retrieved from https://timesofindia.indiatimes.com/: https://timesofindia.indiatimes.com/city/dehradun/pending-electric-bills-stalling-power-projects-says-upcl/articleshow/77320302.cms

UPCL. (2021). BUSINESS PLAN FOR 4TH CONTROL PERIOD. Retrieved from https://uerc.gov.in/: https://uerc.gov.in/ordersPetitions/Petitions/2022-23/UPCL/Business%20Plan%20petition.pdf

UPCL. (2023). Status of UDAY Scheme (March-2021). Retrieved from https://www.upcl.org/uday/: https://www.upcl.org/wp-content/uploads/2021/08/uday-31032021.pdf

Varshith Devana, A. T. (2025). Powering Progress: DISCOMs and the Energy Sector in India. Retrieved from https://fdrindia.org/powering-progress-discoms-and-the-20Annual energy-sector-in-india/

Verma, M. K., Mukherjee, V., Yadav, V. K., & Ghosh, S.(2020). Indian power distribution sector reforms: A critical review. Energy Policy. doi:https://doi.org/10.1016/j.enpol.2020.111672

Vishal Singh Patyal, R. K. (2023). Performance evaluation of Indian electricity distribution companies: An integrated DEA-IRP-TOPSIS approach. Energy Economics, 124. doi:https://doi.org/10.1016/j.eneco.2023.106796.

Yadav, M. (2022). FINANCIAL PERFORMANCE OF POWER SECTOR. Dogo Rangsang Research Journal, 09(01). Retrieved from https://www.journal-dogorangsang.in/no_1_Online_22/33.pdf

Downloads

Published

2025-12-24

How to Cite

Gupta, D. V., & Chaddha, D. S. (2025). Analyzing the Financial Performance of Discom Sector: (Special Reference to Uttarakhand Power Corporation Limited, Uttarakhand). IHRDI Journal of Sustainable Development, 2(2), 36–52. Retrieved from https://qtanalytics.in/journals/index.php/IJSD/article/view/5428